There are three ways to install the LED display screen in the hotel banquet hall, including wall hanging, hoisting and inlaying. Here, we will tell you the environment and installation steps of three installation methods.

Wall mounted


Wall hanging environment: the wall must have sufficient bearing capacity, and it is easy to use expansion bolts, ordinary bolts or walls that are easy to weld (such as steel walls), so as to facilitate the fixing and hanging of LED display on the wall.
Installation steps for wall installation:

1. Before installation, it is necessary to know whether the wall has enough bearing capacity to fix the display screen;
2. After confirming that the wall has sufficient bearing capacity, carry out actual measurement according to the actual requirements of the customer (installation position, installation height, left and right distance), make detailed records, and make scales on the wall, which must be clearly marked for better next work;
3. Determine the number of pendants to be used according to the height of LED display screen and mark them;
4. Fix the display pendant at both ends. Measure with a horizontal tube to ensure that the two pendants are on the same plane. After the pendants at both ends are fixed, install other pendants based on the plane of the two pendants;
5. After hanging the display screen on the installed pendant, use screws to firmly connect the display frame with the pendant;
6. Inspection: the display screen should be installed horizontally, and the levelness of both ends should not exceed 5mm;

Hoisting


Suitable environment for hoisting: there is no wall around, and there is no LED display screen with fixed points indoors, but the roof has sufficient bearing capacity
Hoisting and installation steps:
1. Before installation, know whether the roof or other fixed roofs have enough bearing capacity to fix the LED display;
2. After confirming that the roof or other fixed roofs have sufficient bearing capacity, carry out actual measurement according to the actual requirements of the customer (installation position), make detailed records, and make scales on the roof or other fixed roofs, which must be clearly marked in order to better carry out the next step;
3. Determine the number of pendants to be used according to the height of the display screen and mark them;
4. Fix both ends of the display lifting pendant first. Measure with a stay wire. After the pendants at both ends are fixed, install other middle pendants on the basis of these two pendants;
5. After hanging the display screen on the installed lifting pendant, use screws to firmly connect the LED display frame with the lifting pendant;
6. Inspection: the display screen should be lifted horizontally, and the levelness of both ends should not exceed 5mm.

LED display screen

inlay


Applicable environment for LED display screen inlay: the display screen is required to be installed concealed
Installation steps of inlay:
1. Before installation, you must know the finished size of the display, and then make the size of the mosaic, which is subject to the finished size of the display. 2. Put the whole display screen into the place to be inlaid
3. Fix the display frame and firmly connect the display frame with the surrounding connectors with screws
4. Check that the display screen should be installed smoothly, and the distance between the plane around the frame and the outer surface of the inlay must be consistent. The error shall not exceed 5 mm.